LHC Design Report Volume I

The LHC Main Ring
   
1 Introduction 
2 Beam Parameters and Definitions 
3 Layout and Performance 
4 Optics and Single Particle Dynamics 
5 Collective Effects 
6 RF Systems & Beam Feedback
7 Main Magnets in the Arcs 
8 Insertion Magnets 
9 Powering and Protection 
10 Power Converter System 
11 Cryogenics 
12 Vacuum system 
13 Beam Instrumentation 
14 Control System 
15 Machine Interlock System 
16 Injection System 
17 Beam Dumping System 
18 Beam Cleaning and Collimation System 
19 Interface with and Requirements from the Experiments
20 Parameters, Commissioning and Operation 
21 The LHC as a Lead Ion Collider 

LHC Design Report Volume II

The LHC Infrastructure and General Services
   
1 Introduction
2 The Site, Buildings and Underground Structures
3 Safety Issues
4 Radiation Protection and Shielding
5 Access Systems
6 Communication Networks
7 Power Distribution, Signal Cabling and Optical Fibre Installation
8 Cooling and Ventilation
9 Integration and Overall Machine Equipment Layout
10 Experimental Areas
11 The Alignment of LHC Components
12 Logistics and Installation
13 Monitoring and Operation of General Services

LHC Design Report Volume III

The LHC Injector Chain
Part 1 The Proton Pre-Injectors
1 Introduction
2 Beam Requirements & Fundamental Choices
3 Proton Linac for LHC Injection
4 Upgrading the PSB to 1.4 GeV - Power Supplies
5 Booster Energy Upgrade to 1.4 GeV - Other Systems
6 Booster RF Systems
7 Bunch Splitting and Bunch Rotation in the PS
8 New PS RF Cavities
9 Transverse Emittance Conservation and Measurement
10 Performance of the Pre-Injector Complex 
   

Part 2 The SPS as LHC Injector

11 Introduction
12 Beam Parameters and Requirements
13 The SPS Injection Channel
14 The SPS Damper
15 Preservation of the Transverse Emittance
16 RF System and Longitudinal Beam Dynamics
17 Machine Impedance Issues
18 Extraction towards the LHC
19 Beam Instrumentation
20 The Internal Beam Dumping System
   

Part 3 The LHC Transfer Lines

21 Introduction
22 Transfer Line Optics and Layout
23 General Services
24 Transfer Line Magnets
25 Transfer Line Powering
26 Beam Instrumentation
27 Transfer Line Dumps, Safety Stoppers and Collimators
28 Vacuum System for LHC Transfer Lines TI 2 and TI 8
29 Access and Safety
30 Integration and Installation
31 Commissioning
 
Part 4 The LHC Ion Injector Chain
32 Introduction
33 Beam Request and Overview
34 Source and Linac 3
35 LEIR
36 Linac3-LEIR-PS Transfer Lines
37 PS and Transfer Line to SPS
38 SPS